myCBSEguide App
Download the app to get CBSE Sample Papers 2023-24, NCERT Solutions (Revised), Most Important Questions, Previous Year Question Bank, Mock Tests, and Detailed Notes.
Install NowCBSE class 12 Engineering Graphics New Syllabus 2018-19 in PDF format for free download. Engineering Graphics New syllabus for 2018 2019 class 12 CBSE is now available in myCBSEguide app. The curriculum for March 2019 exams is designed by CBSE, New Delhi as per NCERT text books for the session 2018-19.
Download CBSE class 12 Engineering Graphics New Syllabus 2018-19
CBSE class 12 Engineering Graphics New Syllabus 2018-19
(Theory)
One Paper: 3 Hours 70 Marks
S. No. | Unit | Marks | Periods |
Unit -I | Isometric Projections of Solids | 25 | 50 |
Unit – II | Machine Drawing
| 45 | 118 |
Practical | 30 | 72 | |
Total Marks | 100 | 240 |
Unit I: Isometric Projection of Solids: 50 Periods
- Construction of isometric scale showing main divisions of 10mm and smaller divisions of1mm, also showing the leading angles. Drawing helping view/s such as triangles, pentagon, hexagon, etc., using isometric scale.
- Isometric projection (drawn to isometric scale) of solids such as cube, regular prism and pyramids (triangular, square, pentagonal and hexagonal), cone, cylinder, sphere, hemi- sphere, frustum of right regular pyramids (triangular, square, pentagonal, hexagonal) and cone, when they are cut by a plane parallel to the base. The axis and the base side of the solid should be either perpendicular to HP / VP or parallel to HP and VP. (Indicate the direction ofviewing)
- Combination of two solids (except “frustum” of Pyramids and Cone) Keeping the base side parallel or perpendicular to HP/VP and placed centrally together, axis of both the solids should not begiven paralleltoHP.
Note:
- Question on frustum will be asked in vertical position only.
- Hidden lines are not required in isometricprojection.
Unit II: Machine Drawing (as per SP46: 2003): 118 Periods
- Drawing of machine parts 36 Periods
- Drawing to full size scale with instruments.
(Internal choice will be given between any two of the following). Introduction of threads: Standard profiles of screw threads square, knuckle, B.S.W.,Metric (external and internal). Bolts (Square, Hexagonal, Tee and Hook); Nuts: (Square and Hexagonal), Plain washer, combination of nut and bolt with or without washer for assembling two parts together, Single riveted lap joint with standarddimensions. - Free-hand sketches
(Internal choice will be given between any two of the following).
Conventional representation of external and internal threads; studs (plain, squareneck and collar); screws (round-head, cheese-head, 900 flat counter sunk-head, hexagonal socket head and grub-screw). Types of rivets:- snap head, pan headwithout tapered neck, flat head and 600 countersunk flat head. Types of sunk-keys (rectangular taper, woodruff and double-head feather key with gib head on both ends).
Note: In the above mentioned machine parts (free hand sketches) “in-position” shall not be asked.
- Drawing to full size scale with instruments.
- Assembly drawings and Dis-Assembly drawings (Internal choice will be given between an Assembly drawing and a Dis-Assembly drawing).
Note:
- In all Assembly drawings, half sectional front view will be asked. Side/End view or Top View/Plan will be drawn without section.
- In all the Dis-assembly drawings, only two orthographic views (one of the two views may be half in section or full in section) of any two parts.
- (a) In all sectional views, hidden lines/ edges are not to be shown.
(b) In all full views, hidden/edges are to be shown.- Bearings
- Open-Bearing
- Bused- Bearing
- Rod-Joints
- Cotter-joints for circular-rods (socket and spigot joint)
- Cotter-joints for round-rods (sleeve and cotter joint)
- Cotter-joints for square rods (Gib and cotter-joint)
- Tie-rod and Pipe-joint
- Turnbuckle
- Flange pipe joint
- Couplings
- Unprotected Flange Coupling (having socket and spigot arrangement)
- Protected Flange Coupling
- Pulleys
- Solid cast iron pulley – (up to 200 mm diameters) having solid web
- Bearings
PRACTICALS 30 Marks: 72 Periods
One paper (Practical): 3Hours
CBSE class 12 Engineering Graphics New Syllabus 2018-19
- (i) To perform the following tasks from the given views of the prescribed Machine
Block (One).
Value-Points- Copy the given views (1)
- Drawing the missing view without hidden lines (2)
- Sketching the Isometric view without hidden edges (5)
- To make the machine block of the above in three dimensions.
(not to scale but approximately proportionately) drawn with any medium i.e. thermocol, soapcake, plasticine, clay, wax, orchsis (available with florists), etc. (7)
- Computer Aided Design (CAD) – Project (10)
Project file to be submitted on the simple solids (Prism, Pyramids and Frustums of equilateral triangle, square, pentagon and hexagon) or machine blocks as prescribed in part-I by using the CAD software. - Sessional work relating to machine blocks as prescribed. (3)
- Viva-voce based on part-I and part-II (2)
Total Marks: 30
Download CBSE Syllabus of Class 12th
- CBSE Syllabus class 12th Physics
- CBSE Syllabus class 12th Chemistry
- CBSE Syllabus class 12th biology
- CBSE Syllabus class 12th Mathematics
- CBSE Syllabus for class 12th Accountancy
- CBSE Syllabus class 12th Economics
- CBSE Syllabus class 12th Business studies
- CBSE Syllabus class 12th English core
- CBSE Syllabus class 12th Hindi core
- CBSE Syllabus class 12th History
- CBSE Syllabus class 12th Political science
- CBSE Syllabus class 12th Geography
- CBSE Syllabus class 12th Sociology
- CBSE Syllabus class 12th Home science
Test Generator
Create question paper PDF and online tests with your own name & logo in minutes.
Create NowmyCBSEguide
Question Bank, Mock Tests, Exam Papers, NCERT Solutions, Sample Papers, Notes
Install Now